中国西门子总代理商PLC模块代理
学习电气控制的主导思想简单的问题复杂化:根据能用到的所有场景将各个指令深入测试和研究,常规和非常规的都要测试。
(3)梯形图思维:每一个指令的变化将会导致不同的结果。
Industrial Ethernet Product Information Jump toOverview Benefits 中国西门子总代理商PLC模块代理Overview Typical configuration example for redundant plant bus The plant bus and the terminal bus for multi-user systems with client/server architecture are implemented with Industrial Ethernet, a powerful area and cell network for industrial applications in line with the international IEEE 802.3 standard (Ethernet). Bus structures with optical rings are particularly suitable for this because of their interference immunity and high availability.中国西门子总代理商PLC模块代理 In medium-sized and large plants with high requirements, SIMATIC PCS 7 relies on modern FastEthernet and Gigabit technology. This combines the high reliability of optical rings with the scalable performance of switching technology and high transmission rates of up to 10 Gbps. 中国西门子总代理商PLC模块代理 BenefitsEthernet is now the number 1 network technology in the global LAN environment. Ethernet offers important characteristics that can give you significant advantages for your application: Fast commissioning through simple connections High flexibility since existing networks can be extended without any adverse effects High availability thanks to redundant network topologies Almost unlimited communications performance because scalable performance is available through switching technology if required Networking of different application areas (e.g. office and production) Investment security through continuous compatible further development Plant-wide clock system permits exact assignment of events within the entire system中国西门子总代理商PLC模块代理 Ethernet technology for industrial environmentsWith Industrial Ethernet, SIMATIC NET expands Ethernet technology with future-proof network components with special features and capabilities for use in industrial environments, for example: Rugged design, suitable for harsh industrial environments Fast local assembly using the FastConnect cabling system High fault tolerance due to redundancy and fast redundancy switchover, from bumpless redundancy through PRP and HSR to ring redundancy with MRP Continuous and central monitoring of network components with a simple yet effective signaling concept, and network management software 中国西门子总代理商PLC模块代理 The following Ethernet communications interfaces are used in the various SIMATIC PCS 7 subsystems (ES, OS, AS etc.): Interface modules integrated onboard Simple network adapters Special communications modules, e.g. CP 1623 and CP 1628 They are defined when selecting the respective system components, depending on the requirements. You can find more information in the section "System connection of PCS 7 systems". The communication stations can be integrated in the terminal bus and the plant bus using Industrial Ethernet switches of the SCALANCE X product family. These switches offer scalable performance at an attractive price and support a wide variety of configuration options.v中国西门子总代理商PLC模块代理 Configuration example for plant and terminal bus Terminal bus中国西门子总代理商PLC模块代理Client-server and server-server communication is carried out on a dedicated Ethernet LAN. The communication network identified as a terminal bus can be implemented with standard SIMATIC NET components such as Industrial Ethernet switches, onboard interface modules, network adapters, communications processors (CP), cabling, etc.中国西门子总代理商PLC模块代理 A ring design avoids communication failures should the line become damaged or disconnected at a particular point. To further increase availability, it is also possible to distribute terminal bus communication over two redundant rings. Each PCS 7 station is connected to one of two Industrial Ethernet ports on each of the two separate rings. The SIMATIC NET SOFTNET‑IE RNA communication software on the PCS 7 stations organizes communication processes based on the PRP. Non-PRP-enabled terminal devices that have only one Industrial Ethernet port can be integrated in the redundant terminal bus via SCALANCE X204RNA.中国西门子总代理商PLC模块代理 According to IEC 62439-3, the Parallel Redundancy Protocol (PRP) is based on double transmission of message frames over two separate networks (Ring 1, Ring 2). On the sender side, the SOFTNET-IE RNA software or SCALANCE X-200RNA network access point duplicates the message frame arriving from the sender and feeds one message frame to Ring 1 and the other to Ring 2. On the receiver side, the software or network access point forwards the first incoming message frame to the recipient. The second message frame from the second LAN is discarded. Transmission of the message frame is thus always ensured without delay if an error occurs. Industrial Ethernet plant bus中国西门子总代理商PLC模块代理The automation systems (AS) communicate with one another and with the engineering system and Operator Systems (Servers/Single Stations) over the Industrial Ethernet plant bus. This can be configured in a similar way to the terminal bus, using SIMATIC NET standard components such as Industrial Ethernet switches, network adapters, communications modules (CP), cabling, etc. For small plants with up to 8 standard automation systems per Operator System, Single Stations and servers can be efficiently operated on the plant bus using "Basic Communication Ethernet" (BCE) and a FastEthernet network adapter. The CP 1623/CP 1628 communications module is always required if more than 8 automation systems or redundant automation systems are used.中国西门子总代理商PLC模块代理 As far as availability is concerned, ring topologies are always the first choice for the plant bus. With particularly high availability requirements, the plant bus can also be configured as a redundant double ring (two CPs per AS CPU and OS server). Double faults such as a switch failure on ring 1 with a simultaneous interruption in the bus cable on ring 2 can then be tolerated. The two rings in such a configuration are physically separated. The coupling partners are linked together logically when configuring with NetPro over a high-availability S7 connection (4‑way redundancy). One switch each takes over the function of the redundancy manager for each ring. The current switches of the SCALANCE X‑500, X‑400, X‑300 and X‑200 product lines can act as redundancy manager in a ring. Note:中国西门子总代理商PLC模块代理 |
需要实际上路来开车实践的。本书就像导航软件一样对大家进行一些指导和指引,帮助大家找到合适的方法和路线,避免绕远和走弯路,进而提高学习效率。
1.4.1 用梯形图的思维按照生产工艺去编写程序,逐个分析指令的增减可能导致的,修改并完善程序,然后再调试运行。
(4)以被控机械为主、电气控制为辅的原则来实现工艺需求。
1.4.3 电气接线和编程一般学习电气控制和PLC需要具备的能力
(2)分析能力:都比较复杂,同一现象的发生可能是由多种因素导致的,因此需要良好的分析能力和判断能力。
(3)处理问题的能力:做电气控制要胆大心细,要有处理问题的能力,否则以后面对新的现场和复杂的程序,没有处理问题的能力则无法顺利完成项目。
1.4.4 学习电气控制和PLC的工具
(1):官有经典实用案例和特别注意事项,官有技术、软件、手册和说明书。
(2)百度:百度一般有你想要的资料,百度能解决一般的问题,百度也可以给你指引一定的思路。
(3)淘宝:的淘宝几乎什么都有,如果想要学习,比较快捷的方法是去淘宝搜索自己需要的设备和器件,
没有相同型号的则可以找类似的,卖家将描述的详细程度让你不懂都不行。这家不行再找下一家,总有一家能解决你的问题。较为**的就是使用参数和基本的接线,不懂的还可以打电话问卖家如何使用。明你不是*人,你不是*人就会有所忘记。既然你会有所忘记,你就需要做笔记或者总结文档,方便日后自己不懂的时候拿出来看看,也方便你日后可以教授给其他人。总结一下:把自己当老师来对待,做好将所学知识教给其他人的准备,因为每个人的见解都是*特的。
1.5.3 营造学习氛围
找到工控圈或者学习群,这样的群体会给你带来不同的*观、体验观和不同的机会。包括学习机会、开阔视野的机会、就业机会和做工程项目的机会等。我们每个人都需要有自己的圈子,电气人员*需要有这样的圈子。
1.6 PLC编程的学习路线